Historical Background
For much of the 20th Century, asbestos was considered a miracle material primarily due to its proven longevity, strength, heat resistance, insulating and waterproofing qualities. Asbestos was used extensively and featured in a variety of materials / components including:
Today, we are well aware of the health problems associated with asbestos exposure and its use in the UK has been progressively prohibited by law since the 1980s (culminating in a complete ban in 1999). The use of asbestos within buildings has left an enduring legacy that is as complicated as it is hazardous.
Managing Asbestos in the 21st Century
The Control of Asbestos Regulations 2012 places responsibilities on property owners and managers to protect those using or working in their premises from asbestos exposure and the associated health risks. Such premises include residential common parts. This has particular relevance when undertaking refurbishment works that inevitably disturb materials and generate dust.
Most property professionals will know that prior to any refurbishment project an asbestos refurbishment and demolition (R&D) survey must be carried out by a competent asbestos consultant. The only exception is where a building was constructed after 2000, or where existing records prove that no asbestos is present.
An R&D survey is a comprehensive inspection of the subject area which seeks to ascertain the location and condition of any asbestos. A risk assessment is then carried out and thereafter, measures are recommended to reduce or eliminate those risks identified.
Asbestos Removal
The removal of asbestos containing materials (ACMs) is usually recommended in one (or a combination) of the following situations:
As an example, decorative textured coatings could fall into all three categories. These coatings are often located in high quantities (Cat 1) applied across entire wall / ceiling surfaces, can exhibit signs of physical damage (Cat 2) and are likely to be damaged further due to location (Cat 3) such as corridor walls and ceilings.
Where a common parts refurbishment is instructed and the scope of refurbishment is such that damage or disruption to ACMs is likely or where the ACMs are in such poor condition that removal is required, then the formulation of an effective strategy in how to deal with the ACM removal is the next step.
ACM Removal - The Role of the Building Surveyor
As a first step, an R&D survey will be commissioned and the subsequent risk assessment will help quantify the extent of ACM removal.
The ACM removal needs to be considered in the overall context of the refurbishment package. The Building Surveyor (or other property professional) will now need to take the following actions:
Once the scope of works from a technical standpoint has been ascertained then careful consideration is to be given as to how the execution of these works can be best achieved. This will require an assessment into whether ACM removal is possible with / without residents in occupation. If we assume for this article that temporary relocation is required then it is important to ensure sufficient planning / lead-in time is worked into the overall programme to enable time for arranging alternative accommodation.
As with many common parts works it is often the managerial and logistical aspects that present the biggest challenge. With this in mind the following headline factors need all due consideration:
Understandably, residents can be apprehensive about the nature of ACM removal work and also about leaving their homes unattended. The overseeing surveyor will have a pivotal role in allaying any anxieties or concerns that may exist. The procedures and processes relating to health and security must be efficient, simple and easy to understand by all parties.
Case Study
In 2015, Harris Associates were appointed to specify and project manage the internal common parts refurbishment of nineteen early 20th Century mansion blocks in West London. The works included extensive asbestos removal. The works were further complicated by the renewal of landlords and tenants electrical supplies as well as a full interior refurbishment.
Each block contained 10 flats, accessed by a single common stairwell. Asbestos was identified throughout each of these stairwells and featured in textured wall coverings, ceiling coatings, electrical equipment and stair infill panels. Key aspects of this project are as follows:
The ACM removal work was carried out successfully, safely and securely and in accordance with the agreed programme. The very precise planning for the ACM removal and the effective team work and liaison between ourselves, property managers and residents resulted in a potentially tricky element of the refurbishment works package being rolled out all in a rather uneventful fashion.
Shaun Harris, Managing Director of Harris Associates and Steven McCormack, Senior Surveyor - Team Leader at Harris Associates.